Wednesday, 27 June 2012

Bits and Pieces Trickle In.....The Gearbox Continued...

Monday saw the arrival of a long awaited box from Burton Power via DHL. In the box was a set of Cosworth 11:1 pistons, gudgeon pins and rings, main bearing and big end shells, conrod bolts, a new friction washer and a crankshaft position sensor.

Last night I took the old piston/con rod assemblies, marked them, and they will go to the local engineering shop to have the old pins pressed out and the new pistons installed.

Also the speedo gear must still come off the mainshaft. It won't be going back on as I won't be needing it, making subsequent stripping jobs a lot easier.

I cleaned up the gearbox parts I have taken off already as far as I could with paraffin, catalogued and bagged them neatly in order so that come re-assembly it will be a lot easier. I even took photos so that I can put it all back together again.

If I can get the bearing sizes and seal sizes for the box I will be even happier. The one bearing on the input shaft is a FAG 545893 single row ball bearing with locator ring - it measures 35*77*17 bearing which I can source, the others I must still get the dimensions because some do not have a number at all!! The local bearing shop says no problem he can get anything I need.

If I want gaskets I am going to have to make my own. Easy peasy. The seals I must pick out of the tail housing but they are going to be completely knackered in that process.

The rear seal plate of the selector housing is gone (as in completely missing) - I am going to make up a plate with some thick aluminium and tap it into place. I am also going to have to source a brass selector saddle, anything plastic on the selector will break or disintegrate inside a week. It is as rough as a bear's arse.

Once I am finished with this box and it has the seals and bearings on it I will have more confidence in the unit.

I am still awaiting a shipment from Raceline. It was supposedly shipped on Friday 22nd and the bucks came out my account, but no tracking number as yet. That has the cam cover, water rail, cams, springs, thermostat housing, flywheel, clutch, and starter motor. Can't wait.

Finally Jeremy (my daughter Fiona's BF) collected some 12mm diff mount bobbins from the factory so I can finish mounting and torquing up the diff. Bless his little cotton socks. The lad is going off to Thailand on Saturday to do some missionary work for 6 months - Fiona is all sniffy and morose. Shame.

This is a bit of an update for future reference:

Front I/P shaft bearing FAG Z-566096 KL-H49A
Rear O/P shaft bearing SKF BB1B-362021

Front Layshaft HD Bearing INA F-208843
Rear Layshaft Bearing Torrington 545995

Monday, 25 June 2012

Stripping the Gearbox

On Saturday I headed into a unseasonably wet Springs to collect a 5 speed T9N gearbox from Joe's Scrapyard. The only one they had came out of a Cortina 3.0l bakkie so I am thinking the first gear is gonna be a little short. But hey, there's only one available so R4500 later I am on my way home. It has a short input shaft and no gearlever so I cannot test if it even has all its gears.

Sunday morning and first thing I do is head for Autozone and get me some decent circlip pliers.

The gearbox came with a bell housing which is a massive bit of metal, including the clutch lever and thrust washer. Some fiddling about trying to remove the lever with no joy, so I hold the lever forward while I bash the thrust washer backward. Success. Those two bits come out and now 4 bolts are holding the housing to the gearbox. So out with the impact wrench and 10 seconds later the housing is off.

Now at least I can manoeuver the box around.

First off is the top cover and I tip out all the oil into the bucket. The oil is clear and clean, which is a surprise. Then I notice the gasket off the top cover is liberally covered in RTV, which tells me this box has been opened. Now this can be good, or bad. Good in that it may have been re-conditioned properly, or bad in that some shade tree mack has tried to recondition or repair it, and failed.

I press on, following the Haynes manual I downloaded off the net. The box comes apart slowly and the plastic container slowly fills up with springs, shafts, blocker bars, circlips and synchro rings. To my surprise, the synchro rings look pretty new, they still have ridges on them, the bearings feel tight and the gears are not worn at all. So the box is in pretty good nick. The only main problems I can see is the selector connector has been badly hacked with a file and the plastic saddle that sits on it has disintegrated. The rear round cover is missing and has been replaced by a "wall" of RTV.

When I get to the very bottom of the case, the magnet is completely covered with fine steel sludge sticking to it. Far more than a gearbox in this condition would suggest, so maybe the previous repair mob didn't clean it up.

The speedo gear must come off  - an engineering firm must help I do not have a big enough puller.
 


I cleaned the parts as I went - I absolutely HATE gear oil. Note to self - get some paraffin!

Monday, 18 June 2012

Gearbox found

The search for a 5 speed Sierra gearbox is over. S'funny but I phoned the scrapyard looking for a Type-9 gearbox a month ago and they said they did not have any. This time I asked for a Sapphire or Sierra 5-speed box and they said Yeah no problem!!

I rescued the old coil pack that I stripped from the engine a month ago, with the intention of replacing it with a new part. It will have to do - a new one is pretty expensive! I am going to have to scrape pennies together for the next couple of months.

Spent an interesting hour this evening just paging through the Burton Power on-line catalogue - there is horbs of info on speccing, building and tuning Ford engines. And lots of good ideas.

Sunday, 17 June 2012

Fuel Tank and the Fuel system

I had to give up on the seatbelts because the factory has supplied the wrong belt receivers - they do not have the electric switch that actuates the seatbelt warning light.

For the rest of the day I connected together the fuel system at the back, tank to pump, pump to filter, filter to feed line, return line to regulator, regulator to tank. Lastly the fuel tank and filler hose was installed, and the tank strapped in. The boot was placed on the back to check for interference, thankfully there is none.

The Webcon regulator is a snazzy little piece of kit, unfortunately I bollocksed up the bracket by cutting in the wrong place, so I had to modify the bit that was left. No matter it fits now to the cockpit rear wall.

 I had to go and buy 10mm fuel hose because the stuff supplied is just too damn small for the fuel pump inlet.

My last move here will be to cable tie the hoses, then drill the holes for the rear number plate and lights.
What I cannot work out is what the two top tank spigots connect to, and the purpose of that small breather/header tank behind the drivers seat. It's not a swirl pot, of that I am sure.

I removed the front uprights, these were loosely attached to the wishbones. They will not go on again until the shocks arrive.

The front and rear suspensions were torqued up, and the front anti roll bar fastened to its linkages and I applied some lube to the rose joints

Last item on the agenda was to centralise the steering.

Quite a busy day. Now to watch the footy.

Saturday, 16 June 2012

Seat Belts and Fuel System

Today I took a bit of time off and went Clay Pigeon shooting which was very relaxing.

When I got home I got stuck into the fuel system, installing the pump and the filter in the left rear of the rear compartment. I had to stop because the fuel pipe supplied is way too small for the tank outlet and the pump inlet. Birkin have supplied 5/16" hose and what is really needed is 3/8". So I'll wait till Autozone opens tomorrow and get some then.

So I looked around for something to do so I started installing the seat belts. Would you believe the receivers have no internal switch for the seatbelt warning light? I will talk to Autozone tomorrow if they have the right kit. Then if there is any Sunday left to me I must complete the dashboard wiring.

The hunt for a gearbox continues........

Thursday, 14 June 2012

Rims and Throttle Bodies

On Monday the throttle bodies arrived from Webcon and I hooked up the linkages. The set-up looks very professional and well made. Then immediately I boxed it again as I am still a while away from fitting them to the head. The red is going to fit in well with the overall colour scheme.


On the wheels side I went to Tiger Wheel and Tyre and bought a set of 15 * 6.5 rims. They are the silver finish "Drift" rims. These will be powder coated black with a red trim line. I can't decide on which tyres to get in terms of profile, possibly 225/60R15V Bridgestone Turanzas or maybe Toyo R888's 205/55R15.

Tuesday, 12 June 2012

Darn but it is FREEZING!

I tried going outside this arvy to do some work on the car, like fit the fuel filter and regulator but the cold chased me inside again. This morning it was -2 Celsius and this is supposed to be the tropics!!!!
Guess I will have to wait for the weekend.

On a bad news front Cheryl e-mailed and stated the rear uprights, shocks and headlights are still not at the factory so the arrangements I made for a pal on golf tour to collect them will fall through. My back up plan is my daughter's beau Jeremy, he can pick them up end of the month.

You have probably noted I have not mentioned anything about paint schemes. I have chosen a Brilliant Red, it's a standard BMW colour. Rims will be black with Red pinstriping. 205/55R15's all round.

The reason is that I have been quoted R12K plus for a paint job. =8O - I'm told that is the going rate! Well I don't have that kind of tom just lying around. The recommended route is to spray paint first, then build, but you have to be moer careful you don't scratch your paint job while you build. ie you can't wear belt buckles and there has to be carpeting and mats all over the car as you lean in etc etc.

So I, picking the road less travelled, will be painting last. I will paint the scuttle, fenders, bonnet, nose cone and rear mudguards as I go. Then before I do final assembly, spray the rolling chassis.