Sunday, 9 September 2012

Time out for a Rant

Yep, you read right I am downright pissed.

I am struggling with this cooling system. I seem to have been supplied with enough hoses, but there is no indication of what fits where or what connects to what.

On top of that I have gone with a water rail, which deletes at least 2 hoses and one pipe, and I have identified which pipe and what hoses they are - I will have to make up my own layout for that - but as for the rest it's a total mystery.

I also went with the electric water pump, and I spent the morning just staring into the well in front of the engine trying to figger where the water pump and its associated mounting hardware might fit. I could not see it.

Which brings me to my point. How in hell can Birkin put a product onto the market without detailed assembly instructions???

I'm not sure if Birkin realise what liability they are exposing themselves to. Would you travel in a car that was assembled by people who had no instructions on how to put it together?

They say they have the "Build Doctor" BIG FRICKIN' DEAL!!! The doctor starts out all very well but it looks like they got bored with it half way through and gave up.

The section does not cover (inter alia)

The Independent Rear Suspension
The Differential
Installing the Engine (various types)
The Cooling System (Fan, plumbing, fan switch, header tank, water pump)
The Exhaust system

It's farcical.

And the bits that are covered are out of date.

Sure it is a car for enthusiasts built by enthusiasts but not everyone is mechanically savvy to the degree that they can build it to factory spec as was intended. I place myself into that category.

I do realise that most of the assembly is self-evident, but even so...

When I started this I was assured that they (Birkin) had all the drawings and pictures needed on computer, and they were available on request.

Three months down the line and R200 000+ later I am convinced that is not true.

So what did I do today?

I fitted the horn, and the cooling fan and water-pump relays. And not even the horn fitted where I thought it was supposed to. I had to suss that one out for myself.
 

I then decided to man up and design my own water pump installation. You will see above the water pump mounting slot there is the open hole left by the
old Mondeo engine mount stud.
I am going to hang a M12 stud out the bottom and fabricate a bracket that will let the pump hang off that. A lot of the pump's weight will be taken up by the hoses. I will have to get some rubber mounts to null out any engine vibration. My problem with this idea is that the pump is no longer at the lowest point of the system guaranteeing flooded suction, but it is low enough.


Thursday, 6 September 2012

The Water Rail and Exhaust Headers Completed

On Tuesday I had the rail welded up and it looks like a very neat job. I wanted to fit it that day but I had to go to Jo'burg on business and only came back today.

Cutting to the chase the headers were installed, tightened up with the supplied bolts (no studs) and the rail went on straight after with no issues.

It pays to fit and check before you fasten!



Finally I fitted the crank position sensor, using the jig, and fixing the damper with an M6 screw.



I had wanted to fit this while the engine was still on the engine stand, but I was worried it might get damaged in the installation - it is very exposed.

This weekend I will start piecing together the cooling system. This evening I tested the thermostat in a pot of boiling water (it works) and I also drilled a couple of 2mm holes in the thermostat's plunger as a bypass so that the electric pump doesn't cavitate while it is closed.

There are very few bits left to fit on this car - soon it will just be cosmetic stuff like the windscreen and the wipers.

Sunday, 2 September 2012

The Water Rail and Exhaust Headers

This morning I wanted to install the Raceline water rail. It is a very nifty bit of kit that does away with long hoses and pipes to bring hot water from the back of the Duratec to the front.

My first move was to temporarily install the exhaust headers, just to see there were no issues with that bit of the work. I found that the two rear lower manifold studs would not go in, because of the chassis strut.



I had previously had the cylinder head modified to accept the water rail, but this was without the headers in place.


Then I removed the first three headers, leaving the last one in place, fitted the rail and saw immediately there was interference from the exhaust flange. Off came the rail, out came the header and I used a disc grinder to remove metal from the flange. This was a trial and error process, with at least 3 fittings before it fitted. Note the ever-present rubber mallet, this was especially useful to discover binding points. With everything put together, bash the rail a couple of times, and on disassembly, touching points show up on the aluminium. Grind them off, and retry.

I repeated this for the two middle headers, grinding away a bit at a time until the rail fitted. I used the die grinder to remove some from the rail as well.


The last header to fit was #1 cylinder, and this was the big one - a lot of metal had to go from the rail. There was a big flange cast right above the header.


I just removed enough to clear the header, there was about 3mm clearance. The rail will now go to the welding shop where they will place a circular aluminium disk in the top and weld it up for a good seal.



Just to make sure I fitted the rail plus the headers again and it is all a good fit.



I now wanted to fit the cooling hoses and the electric water pump, but I have no clue how the hoses run, especially with a water rail thrown into the mix. So that job will wait until Birkin supply me with some guidance.

Saturday, 1 September 2012

Engine Installation

The big day has arrived.

My first task of the day was to remove about 2mm from the outside of each flexible engine mount. This was easily done with an electric drill and an abrasive disc.

Next was the lift and this was horrendously difficult because while the dimensions were now fine, and we could get the left side M12 bolt in position, the right side was impossible to line up. So much so that we resorted to hammering in the bolt which resulted in a buggered thread. We replaced this with a M10 bolt just to take up the weight.

I re-attached the gearbox mount, and bolted on the sump guard cross member. This meant that if anything was to fail, it would result in a bent chassis and engine.

The engine was now supported by the left hand M12 bolt and the gear mounting, and the M10 bolt. Alastair gently let off the strain and ....she held!

Quickly I re-assessed my options: I re-arranged the sling so that it fastened to one central point at the front of the engine, seeing as it was fixed at the rear, and took the weight off the bolts holding the engine. I withdrew these, and also unscrewed the engine mount brackets for inspection. The right side one was totally chewed and ruined inside the flexible mount, and had to be cleaned up with a rat-tail file, so that the bolt could be inserted.

We then mounted the brackets on the chassis, and in turn, attached the brackets to the engine. Every cap-screw save the one went in - the front mounting point on the right side engine bracket is clearly out of line with the engine mounting hole by 2-3 mm.


The prop shaft was re-attached to the diff, and the reverse switch screwed into the gearbox.

The engine is now installed, and a major milestone met.


I also found my quick shift Quaife gear lever is about 3 inches too long.


Next is the cooling system and the water rail.

Friday, 31 August 2012

Engine Installation - The First Try

This afternoon I hurried home to do some of the work needed before the lift.

During the day Alastair went to Struck and Schulz and swopped out the two mounting bolts for M12 socket head cap screws.

First thing to do was drill the body and establish a hole so that the port mounting bolt could be inserted. This was done relatively quickly with my die grinder, and then I moved to the exhaust portal and made a minor cut so that this bolt could be inserted in a similar fashion.

Off came the propshaft, and the gearbox mount was reversed.

Good, now we were ready, Alastair manned the crane jack and eased the engine off the trolley while I guided the motor up into the well. We were a well oiled team - poetry in motion - synchronised swimming has nothing on us.

But......

Our first lift revealed a problem we hadn't seen in the dark last night - the body dimension between the chassis mounts is about 4mm too narrow for the engine plus its mounts. This means I must grind down the mating faces of the steel mounts that hold the polypropylene flexible bobbins.

Good thing I now have a disc grinder.

God, I love power tools.

Thursday, 30 August 2012

Engine Installation - Initial Steps

We assembled the Chinese Torture Rack last night - I cannot understand why the Chinese have an aversion to washers. We got bolts, nuts, but no washers or spring washers! My engine stand was the same. Nevertheless we assembled the engine crane in record time despite the crappy instructions and it works! I bought a whole slew of washers to install on the crane as I cannot handle looking at a nut with no washer. It doth offend mine eye.





Today we lifted the chassis - using the crane of course - and slid the engine out again so we could prepare it. That involved removing the manifold studs, and mounting some bolts to use as sling points. One other point was to remove the engine mounts from the chassis and mount them instead on the engine. With this done it is now down to lining up 2 bolts instead of 6. Good thing we did this as bolting the starboard mount onto the engine was a mission. It did not line up 100% and I would have hated to complete this job with a swinging motor and cramped engine bay. Thank heavens for Copperslip grease.



Then we did a test lift using my home made slings and the engine came up neat and straight. This was done outside of the chassis to check how she carried herself in the slings. I was reasonably sure of where the CG was.

Next we lifted the chassis (again) and slid the engine and trolley under the chassis for what is hopefully the last time.

We re-attached the slings and did another test lift. The engine has the alternator and starter fitted and there seems to be plenty of room.

With some minor manoevering we were able to get the engine to line up "roughly", but we stopped at this point because I still have to drill an access hole on the left side of the body to allow insertion of the port-side bolt, and there is some minor relieving to be done on the exhaust portal to allow the starboard bolt to be inserted. It was getting too dark to see properly so we wrapped it up for the night.

As an added precaution I am going to undo the prop shaft from the diff. When we do this I want it to be a case of Alastair inserting the two bolts and then quickly under the car to attach the gearbox mount (which BTW must still be fitted right way round).

Tuesday, 28 August 2012

Preparation for the engine installation

So the preparations for preparing to install the engine in the chassis.....we're thinking about getting ready to start those.

We have the chassis up on the stand, and I am thinking that all along it has been really enjoyable working on the car at waist height, everything is accessable, I can get under the car easily....

So I am not going to drop the chassis onto the engine, I am going to lift the engine up into the chassis with the aid of a engine crane - a cheap and cheerful chinese foldup with 2 ton capacity is about R1600 - and work on the car while it is on the stand. When we have to drop the whole running car on the ground? I'll burn that bridge when it comes to crossing it!

When the engine is up inside, the trolley becomes a crawler.

We rolled the engine round to the workplace and slid it under the chassis - I had to lift the front while Al pushed it in.

 Here's another view from above:



I have identified a couple of potential hang up points like the manifold studs and the sharp eyed amongst you will have noticed that I have fitted the gearbox mounting plate arse about face.